Answer
Obtain an installation checklist covering floor space, access routes, unloading arrangements, electrical supply and any required compressed air or extraction equipment. Check the packed dimensions and weight as well as the installed footprint. Complete the site preparations before delivery to reduce delays during installation and commissioning.